Textile/Clothing Upstream (v.2013-1)

Document "Warping Offer"

Document NameWarping Offer
DescriptionOffer from Subcontractor for the warping
Generalities and notes about the usage
The Offer is used by a Subcontractor to respond to the Request of a Fabric Producer for the warping of a yarn.
The Offer is structured in four levels:
Macro-type of Work offered = document root (7 types of Request)
Product Family = document qualifier (type of product with reference to the manufacturing process; e.g.: combed yarn, jacquard weaved fabric, ..)
Product Specifications = "xxxSpecs" (technical characteristics and properties of the product)
Operations offered = "XXXMnfrOperation" (details of the works requested)
Quantities, unit measures and prices must be referred to the third level (Line Item)

SourceeBIZ-TCU / Moda-ML
XML Schemahttp://www.moda-ml.net/moda-ml/repository/schema/v2013-1/WARPOffer.xsd
User Guidehttp://www.moda-ml.net/moda-ml/repository/guide/v2013-1/en/G059-eBIZ-WarpingOffer.pdf
Full Technical Documentationwww.ebiz.enea.it / Warping Offer